System::Globalization::UmAlQuraCalendar class
Contents
[
Hide
]UmAlQuraCalendar class
Um Al Qura calendar. Not implemented. Objects of this class should only be allocated using System::MakeObject() function. Never create instance of this type on stack or using operator new, as it will result in runtime errors and/or assertion faults. Always wrap this class into System::SmartPtr pointer and use this pointer to pass it to functions as argument.
class UmAlQuraCalendar : public System::Globalization::Calendar
Methods
Method | Description |
---|---|
Clone() override | RTTI information. |
get_AlgorithmType() const override | Gets algorithm type. |
get_Eras() const override | Gets list of eras existing in calendar. |
get_MaxSupportedDateTime() const override | Maximal point in time that is supported by the calendar. |
get_MinSupportedDateTime() const override | Minimal point in time that is supported by the calendar. |
GetDayOfWeek(DateTime) const override | Gets day of week for the specified time point. |
GetLeapMonth(int, int) const override | Gets the leap month for the specified year. |
virtual GetLeapMonth(int) const | RTTI information. |
IsLeapDay(int, int, int, int) const override | Checks if the day is leap. |
virtual IsLeapDay(int, int, int) const | Checks if the day is leap. |
IsLeapMonth(int, int, int) const override | Checks if the month is leap. |
virtual IsLeapMonth(int, int) const | Checks if the month is leap. |
IsLeapYear(int, int) const override | Checks if the year is leap. |
virtual IsLeapYear(int) const | Checks if the year is leap. |
set_TwoDigitYearMax(int) override | Sets the last year that can be represented by a 2-digit. |
UmAlQuraCalendar() | Constructor. |
Fields
Field | Description |
---|---|
static constexpr UmAlQuraEra | Current UmAlQura era. |
See Also
- Class Calendar
- Namespace System::Globalization
- Library Aspose.Page for C++