set_Optimistic
set_Optimistic
Sets the percentage of the most likely task duration which can happen in the best possible project scenario. The default value is 75, which means that if the estimated specified task duration is 4 days then the optimistic duration will be 3 days.
Returns: void Aspose::Tasks::RiskAnalysis::
set_Optimistic(int32_t value)
| Parameter | Description |
|---|---|
| value |