set_Pessimistic

set_Pessimistic

Sets the percentage of the most likely task duration which can happen in the worst possible project scenario. The default value is 125, which means that if the estimated specified task duration is 4 days then the pessimistic duration will be 5 days.

Returns: void Aspose::Tasks::RiskAnalysis::

set_Pessimistic(int32_t value)
ParameterDescription
value