
## set_Work {#set_work}

Sets the work assigned to a resource when the baseline is saved. The amount of assigned work to a resource when the baseline was saved.

**Returns:** void Aspose::Tasks::

```cpp
set_Work(Duration value)
```

| Parameter | Description |
| --- | --- |
| value |  |

