set_ShowDrawings
set_ShowDrawings
Sets a value indicating whether drawings on the Gantt Chart must be shown.
Returns: void Aspose::Tasks::
set_ShowDrawings(bool value)
| Parameter | Description |
|---|---|
| value |
Sets a value indicating whether drawings on the Gantt Chart must be shown.
Returns: void Aspose::Tasks::
set_ShowDrawings(bool value)
| Parameter | Description |
|---|---|
| value |