Tsk
Inheritance: java.lang.Object
public class Tsk
Represents properties of Task object.
Constructors
Constructor | Description |
---|---|
Tsk() |
Fields
Field | Description |
---|---|
ACTIVITY_ID | Represents activity id field - a task’s unique identifier used by Primavera. |
ACTUAL_COST | Costs incurred for work already performed by resources on their tasks, together with any other recorded costs associated with the task. |
ACTUAL_DURATION | The span of actual working time for a task, based on the scheduled duration and current remaining work or percent complete. |
ACTUAL_FINISH | The date when a task was completed. |
ACTUAL_OVERTIME_COST | Costs incurred for overtime work already performed on tasks by assigned resources. |
ACTUAL_OVERTIME_WORK | The actual amount of overtime work already performed by resources assigned to tasks. |
ACTUAL_OVERTIME_WORK_PROTECTED | The duration through which actual overtime work is protected. |
ACTUAL_START | The date and time that a task actually began. |
ACTUAL_WORK | The amount of work that has already been done by resources assigned to tasks. |
ACTUAL_WORK_PROTECTED | The duration through which actual work is protected. |
ACWP | Costs incurred for work already done on a task, up to the project status date or today’s date. |
BCWP | The cumulative value of the task’s percent complete multiplied by the time phased baseline costs. |
BCWS | The cumulative time phased baseline costs up to the status date or today’s date. |
BUDGET_COST | Budget costs for budget cost resources. |
BUDGET_WORK | Budget work for budget work and material resources. |
CALENDAR | The task calendar. |
COMMITMENT_FINISH | The finish date of a delivery. |
COMMITMENT_START | The start date of a delivery. |
COMMITMENT_TYPE | Determines whether a task has an associated delivery or a dependency on an associated delivery. |
CONSTRAINT_DATE | The specific date associated with the constraint type. |
CONSTRAINT_TYPE | Provides choices for the type of constraint that can be applied for scheduling a task. |
CONTACT | The name of an individual responsible for a task. |
COST | The total scheduled or projected cost for a task based on costs already incurred for work performed by resources assigned to the tasks, in addition to the costs planned for the remaining work. |
COST_VARIANCE | The difference between the baseline cost and total cost for a task, resource, or assignment. |
CREATED | The date when a task was created. |
CV | The difference between the baseline cost and total cost for a task. |
DEADLINE | A target date that indicates when a task is to be completed. |
DISPLAY_AS_SUMMARY | Determines whether the task should be displayed as a summary task. |
DISPLAY_ON_TIMELINE | Specifies whether a task should be displayed on a timeline view. |
DURATION | The total span of active working time for a task as entered or as calculated by Microsoft Project based on start date, finish date, calendars, and other scheduling factors. |
DURATION_FORMAT | Task duration format. |
DURATION_TEXT | Returns the task’s duration text. |
DURATION_VARIANCE | The difference between the baseline duration of a task and the total duration (current estimate) of a task. |
EARLY_FINISH | The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor tasks, other constraints, and any leveling delay. |
EARLY_START | The earliest date that a task could possibly begin, based on the early start dates of predecessor and successor tasks and other constraints. |
EARNED_VALUE_METHOD | Determines whether the % Complete or Physical % Complete field should be used to calculate budgeted cost of work performed (BCWP). |
EXTERNAL_ID | If a task is an external task it contains the task’s external Id. |
EXTERNAL_TASK_PROJECT | The source location and task identifier of an external task. |
EXTERNAL_UID | Contains the external task’s Unique identifier when the task is external. |
FINISH | The scheduled finish date of a task. |
FINISH_SLACK_TIME_SPAN | The duration (in seconds) between the Early Finish and Late Finish dates. |
FINISH_TEXT | Returns the task’s finish text. |
FINISH_VARIANCE | The time that represents the difference between the baseline finish date of a task or assignment and its current finish date. |
FIXED_COST | Shows any non resource task expense. |
FIXED_COST_ACCRUAL | Determines choices for how and when fixed costs are to be charged, or accrued, to the cost of a task. |
FREE_SLACK_TIME_SPAN | The time (in seconds) that a task can be delayed without delaying any successor tasks. |
GUID | The generated unique identification codes for a task. |
HAS_OVERALLOCATED_RESOURCE | Indicates whether the task has an resource assigned which has more work on assigned tasks than can be completed within normal working capacity. |
HIDE_BAR | Determines whether the Gantt bar of a task is hidden when displayed in Microsoft Project. |
HYPERLINK | The title or explanatory text for a hyperlink associated with a task. |
HYPERLINK_ADDRESS | The address for a hyperlink associated with a task. |
HYPERLINK_SUB_ADDRESS | The specific location in a document in a hyperlink associated with a task. |
ID | The position identifier of a task within the list of tasks. |
IGNORE_RESOURCE_CALENDAR | Determines whether the scheduling of the task considers the calendars of the resources assigned to the task. |
IGNORE_WARNINGS | Indicates whether to hide the schedule conflict warning indicator in Microsoft Project. |
IS_ACTIVE | Determines whether a task is active. |
IS_CRITICAL | Determines whether a task is on the critical path. |
IS_EFFORT_DRIVEN | Determines whether the scheduling for the task is effort-driven scheduling. |
IS_ESTIMATED | Determines whether a task is estimated. |
IS_EXPANDED | Determines whether a summary task is expanded or not in GanttChart view. |
IS_EXTERNAL_TASK | Determines whether a task is external. |
IS_MANUAL | Determines whether a task is manually scheduled. |
IS_MARKED | Shows whether a task is marked for further action or identification of some kind. |
IS_MILESTONE | Determines whether a task is a milestone. |
IS_NULL | Determines whether a task is a null task. |
IS_OVERALLOCATED | Indicates whether any of the assigned resources on a task is assigned to more work on the task than can be done withing the normal working capacity. |
IS_PUBLISHED | Determines whether the current task should be published to Project Server with the rest of the project. |
IS_RECURRING | Determines whether a task is part of a series of recurring tasks. |
IS_RESUME_VALID | Determines whether a task can be resumed. |
IS_ROLLUP | Determines whether information about the subtask Gantt bars will be rolled up to the summary task bar. |
IS_SUBPROJECT | Determines whether a task is an inserted project. |
IS_SUBPROJECT_READ_ONLY | Determines whether a subproject is read-only. |
IS_SUMMARY | Determines whether a task is a summary task. |
LATE_FINISH | The latest date that a task can finish without delaying the finish of the project. |
LATE_START | The latest date that a task can start without delaying the finish of the project. |
LEVELING_CAN_SPLIT | Determines whether the resource leveling function can cause splits on remaining work on this task. |
LEVELING_DELAY | The time that a task is to be delayed from its early start date because of resource leveling. |
LEVEL_ASSIGNMENTS | Determines whether the leveling function can delay and split individual assignments in order to resolve over allocations. |
MANUAL_DURATION | Defines manually scheduled duration of a task. |
MANUAL_FINISH | Defines manually scheduled finish of a task. |
MANUAL_START | Defines manually scheduled start of a task. |
NAME | A task’s name. |
NOTES_RTF | The text notes in RTF format. |
NOTES_TEXT | Notes’ plain text extracted from RTF data. |
OUTLINE_LEVEL | The outline level of a task. |
OUTLINE_NUMBER | The number that represents a task’s position in the hierarchical outline structure. |
OVERTIME_COST | The total overtime cost for a task, for a resource on all assigned tasks, or for a resource assignment. |
OVERTIME_WORK | The amount of overtime scheduled to be performed by all resources assigned to a task. |
PERCENT_COMPLETE | The current status of a task, expressed as the percentage of the task’s duration that has been completed. |
PERCENT_WORK_COMPLETE | The current status of a task expressed as the percentage of work that has been completed. |
PHYSICAL_PERCENT_COMPLETE | Percent complete value that can be be used as an alternative for calculating budgeted cost of work performed (BCWP). |
PRELEVELED_FINISH | The finish date of a task as it was before resource leveling was done. |
PRELEVELED_START | The start date of a task as it was before resource leveling was done. |
PRIORITY | The level of importance given to a task, which in turn indicates how readily a task or assignment can be delayed or split during resource leveling. |
REGULAR_WORK | The total amount of non overtime work scheduled to be performed by resources. |
REMAINING_COST | The remaining scheduled expense that will be incurred in completing the remaining scheduled work. |
REMAINING_DURATION | The time that is required to complete the unfinished part of a task. |
REMAINING_OVERTIME_COST | The remaining scheduled overtime expense for a task. |
REMAINING_OVERTIME_WORK | The amount of remaining scheduled overtime time. |
REMAINING_WORK | The time still required to complete a task or set of tasks. |
RESUME | The date that the remaining part of a task is scheduled to resume after entering any progress. |
START | The scheduled start date of a task. |
START_SLACK_TIME_SPAN | The duration (in seconds) between the Early Start and Late Start dates. |
START_TEXT | Returns the task’s start text. |
START_VARIANCE | The time that represents the difference between a baseline start date of a task or assignment and its currently scheduled start date. |
STATUS_MANAGER | The name of the enterprise resource who is to receive status updates for the current task from resources. |
STOP | The date that represents the end of the actual portion of a task. |
SUBPROJECT_NAME | The source location of a subproject. |
SV | The earned value schedule variance, through the project status date. |
TOTAL_SLACK_TIME_SPAN | The time a task’s finish date can be delayed without delaying the project’s finish date. |
TYPE | The type of a task. |
UID | The unique Id of a task. |
WARNING | Represents the flag which indicates that task has schedule discrepancies. |
WBS | Work breakdown structure (WBS) codes. |
WBS_LEVEL | The rightmost WBS level of a task. |
WORK | The total time scheduled on a task for all assigned resources. |
WORK_VARIANCE | The difference between baseline work of a task and the currently scheduled work. |
Tsk()
public Tsk()
ACTIVITY_ID
public static final Key<String,Byte> ACTIVITY_ID
Represents activity id field - a task’s unique identifier used by Primavera. (only applicable to Primavera projects).
ACTUAL_COST
public static final Key<BigDecimal,Byte> ACTUAL_COST
Costs incurred for work already performed by resources on their tasks, together with any other recorded costs associated with the task.
ACTUAL_DURATION
public static final Key<Duration,Byte> ACTUAL_DURATION
The span of actual working time for a task, based on the scheduled duration and current remaining work or percent complete.
ACTUAL_FINISH
public static final Key<Date,Byte> ACTUAL_FINISH
The date when a task was completed.
ACTUAL_OVERTIME_COST
public static final Key<BigDecimal,Byte> ACTUAL_OVERTIME_COST
Costs incurred for overtime work already performed on tasks by assigned resources.
ACTUAL_OVERTIME_WORK
public static final Key<Duration,Byte> ACTUAL_OVERTIME_WORK
The actual amount of overtime work already performed by resources assigned to tasks.
ACTUAL_OVERTIME_WORK_PROTECTED
public static final Key<Duration,Byte> ACTUAL_OVERTIME_WORK_PROTECTED
The duration through which actual overtime work is protected.
ACTUAL_START
public static final Key<Date,Byte> ACTUAL_START
The date and time that a task actually began.
ACTUAL_WORK
public static final Key<Duration,Byte> ACTUAL_WORK
The amount of work that has already been done by resources assigned to tasks.
ACTUAL_WORK_PROTECTED
public static final Key<Duration,Byte> ACTUAL_WORK_PROTECTED
The duration through which actual work is protected.
Reading supported for XML format only.
ACWP
public static final Key<Double,Byte> ACWP
Costs incurred for work already done on a task, up to the project status date or today’s date.
BCWP
public static final Key<Double,Byte> BCWP
The cumulative value of the task’s percent complete multiplied by the time phased baseline costs.
BCWS
public static final Key<Double,Byte> BCWS
The cumulative time phased baseline costs up to the status date or today’s date.
BUDGET_COST
public static final Key<BigDecimal,Byte> BUDGET_COST
Budget costs for budget cost resources. Budget resources are assigned only to the project summary task.
BUDGET_WORK
public static final Key<Duration,Byte> BUDGET_WORK
Budget work for budget work and material resources. Budget resources are assigned only to the project summary task.
CALENDAR
public static final Key<Calendar,Byte> CALENDAR
The task calendar.
COMMITMENT_FINISH
public static final Key<Date,Byte> COMMITMENT_FINISH
The finish date of a delivery.
Reading supported for XML format only.
COMMITMENT_START
public static final Key<Date,Byte> COMMITMENT_START
The start date of a delivery.
Reading supported for XML format only.
COMMITMENT_TYPE
public static final Key<Integer,Byte> COMMITMENT_TYPE
Determines whether a task has an associated delivery or a dependency on an associated delivery.
Reading supported for XML format only.
CONSTRAINT_DATE
public static final Key<Date,Byte> CONSTRAINT_DATE
The specific date associated with the constraint type.
CONSTRAINT_TYPE
public static final Key<Integer,Byte> CONSTRAINT_TYPE
Provides choices for the type of constraint that can be applied for scheduling a task.
CONTACT
public static final Key<String,Byte> CONTACT
The name of an individual responsible for a task.
COST
public static final Key<BigDecimal,Byte> COST
The total scheduled or projected cost for a task based on costs already incurred for work performed by resources assigned to the tasks, in addition to the costs planned for the remaining work.
COST_VARIANCE
public static final Key<Double,Byte> COST_VARIANCE
The difference between the baseline cost and total cost for a task, resource, or assignment.
CREATED
public static final Key<Date,Byte> CREATED
The date when a task was created.
CV
public static final Key<Double,Byte> CV
The difference between the baseline cost and total cost for a task. Cost Variance = Cost - Baseline Cost
DEADLINE
public static final Key<Date,Byte> DEADLINE
A target date that indicates when a task is to be completed.
DISPLAY_AS_SUMMARY
public static final Key<NullableBool,Byte> DISPLAY_AS_SUMMARY
Determines whether the task should be displayed as a summary task.
Reading supported for XML format only.
DISPLAY_ON_TIMELINE
public static final Key<Boolean,Byte> DISPLAY_ON_TIMELINE
Specifies whether a task should be displayed on a timeline view.
DURATION
public static final Key<Duration,Byte> DURATION
The total span of active working time for a task as entered or as calculated by Microsoft Project based on start date, finish date, calendars, and other scheduling factors.
DURATION_FORMAT
public static final Key<Byte,Byte> DURATION_FORMAT
Task duration format.
DURATION_TEXT
public static final Key<String,Byte> DURATION_TEXT
Returns the task’s duration text.
DURATION_VARIANCE
public static final Key<Duration,Byte> DURATION_VARIANCE
The difference between the baseline duration of a task and the total duration (current estimate) of a task.
EARLY_FINISH
public static final Key<Date,Byte> EARLY_FINISH
The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor tasks, other constraints, and any leveling delay.
EARLY_START
public static final Key<Date,Byte> EARLY_START
The earliest date that a task could possibly begin, based on the early start dates of predecessor and successor tasks and other constraints.
EARNED_VALUE_METHOD
public static final Key<Integer,Byte> EARNED_VALUE_METHOD
Determines whether the % Complete or Physical % Complete field should be used to calculate budgeted cost of work performed (BCWP).
EXTERNAL_ID
public static final Key<Integer,Byte> EXTERNAL_ID
If a task is an external task it contains the task’s external Id.
EXTERNAL_TASK_PROJECT
public static final Key<String,Byte> EXTERNAL_TASK_PROJECT
The source location and task identifier of an external task.
EXTERNAL_UID
public static final Key<Integer,Byte> EXTERNAL_UID
Contains the external task’s Unique identifier when the task is external.
FINISH
public static final Key<Date,Byte> FINISH
The scheduled finish date of a task.
FINISH_SLACK_TIME_SPAN
public static final Key<TimeDelta,Byte> FINISH_SLACK_TIME_SPAN
The duration (in seconds) between the Early Finish and Late Finish dates.
FINISH_TEXT
public static final Key<String,Byte> FINISH_TEXT
Returns the task’s finish text.
FINISH_VARIANCE
public static final Key<Duration,Byte> FINISH_VARIANCE
The time that represents the difference between the baseline finish date of a task or assignment and its current finish date.
FIXED_COST
public static final Key<Double,Byte> FIXED_COST
Shows any non resource task expense.
FIXED_COST_ACCRUAL
public static final Key<Integer,Byte> FIXED_COST_ACCRUAL
Determines choices for how and when fixed costs are to be charged, or accrued, to the cost of a task.
FREE_SLACK_TIME_SPAN
public static final Key<TimeDelta,Byte> FREE_SLACK_TIME_SPAN
The time (in seconds) that a task can be delayed without delaying any successor tasks.
GUID
public static final Key<String,Byte> GUID
The generated unique identification codes for a task.
HAS_OVERALLOCATED_RESOURCE
public static final Key<NullableBool,Byte> HAS_OVERALLOCATED_RESOURCE
Indicates whether the task has an resource assigned which has more work on assigned tasks than can be completed within normal working capacity.
HIDE_BAR
public static final Key<NullableBool,Byte> HIDE_BAR
Determines whether the Gantt bar of a task is hidden when displayed in Microsoft Project.
HYPERLINK
public static final Key<String,Byte> HYPERLINK
The title or explanatory text for a hyperlink associated with a task.
HYPERLINK_ADDRESS
public static final Key<String,Byte> HYPERLINK_ADDRESS
The address for a hyperlink associated with a task.
The full address (Hyperlink Href in Microsoft Project) of the hyperlink is a concatenation of HyperlinkAddress and HyperlinkSubAddress.
HYPERLINK_SUB_ADDRESS
public static final Key<String,Byte> HYPERLINK_SUB_ADDRESS
The specific location in a document in a hyperlink associated with a task.
The full address (Hyperlink Href in Microsoft Project) of the hyperlink is a concatenation of HyperlinkAddress and HyperlinkSubAddress.
ID
public static final Key<Integer,Byte> ID
The position identifier of a task within the list of tasks.
IGNORE_RESOURCE_CALENDAR
public static final Key<NullableBool,Byte> IGNORE_RESOURCE_CALENDAR
Determines whether the scheduling of the task considers the calendars of the resources assigned to the task.
IGNORE_WARNINGS
public static final Key<Boolean,Byte> IGNORE_WARNINGS
Indicates whether to hide the schedule conflict warning indicator in Microsoft Project.
IS_ACTIVE
public static final Key<NullableBool,Byte> IS_ACTIVE
Determines whether a task is active. Inactive tasks no longer affect other tasks or the overall Project schedule.
IS_CRITICAL
public static final Key<NullableBool,Byte> IS_CRITICAL
Determines whether a task is on the critical path.
IS_EFFORT_DRIVEN
public static final Key<NullableBool,Byte> IS_EFFORT_DRIVEN
Determines whether the scheduling for the task is effort-driven scheduling.
IS_ESTIMATED
public static final Key<NullableBool,Byte> IS_ESTIMATED
Determines whether a task is estimated.
IS_EXPANDED
public static final Key<NullableBool,Byte> IS_EXPANDED
Determines whether a summary task is expanded or not in GanttChart view.
IS_EXTERNAL_TASK
public static final Key<Boolean,Byte> IS_EXTERNAL_TASK
Determines whether a task is external.
IS_MANUAL
public static final Key<NullableBool,Byte> IS_MANUAL
Determines whether a task is manually scheduled.
IS_MARKED
public static final Key<Boolean,Byte> IS_MARKED
Shows whether a task is marked for further action or identification of some kind.
Applies to mpp file format only.
IS_MILESTONE
public static final Key<NullableBool,Byte> IS_MILESTONE
Determines whether a task is a milestone.
IS_NULL
public static final Key<NullableBool,Byte> IS_NULL
Determines whether a task is a null task.
IS_OVERALLOCATED
public static final Key<NullableBool,Byte> IS_OVERALLOCATED
Indicates whether any of the assigned resources on a task is assigned to more work on the task than can be done withing the normal working capacity.
IS_PUBLISHED
public static final Key<NullableBool,Byte> IS_PUBLISHED
Determines whether the current task should be published to Project Server with the rest of the project.
IS_RECURRING
public static final Key<NullableBool,Byte> IS_RECURRING
Determines whether a task is part of a series of recurring tasks.
IS_RESUME_VALID
public static final Key<NullableBool,Byte> IS_RESUME_VALID
Determines whether a task can be resumed.
IS_ROLLUP
public static final Key<NullableBool,Byte> IS_ROLLUP
Determines whether information about the subtask Gantt bars will be rolled up to the summary task bar.
IS_SUBPROJECT
public static final Key<Boolean,Byte> IS_SUBPROJECT
Determines whether a task is an inserted project.
IS_SUBPROJECT_READ_ONLY
public static final Key<NullableBool,Byte> IS_SUBPROJECT_READ_ONLY
Determines whether a subproject is read-only.
IS_SUMMARY
public static final Key<Boolean,Byte> IS_SUMMARY
Determines whether a task is a summary task.
LATE_FINISH
public static final Key<Date,Byte> LATE_FINISH
The latest date that a task can finish without delaying the finish of the project.
LATE_START
public static final Key<Date,Byte> LATE_START
The latest date that a task can start without delaying the finish of the project.
LEVELING_CAN_SPLIT
public static final Key<NullableBool,Byte> LEVELING_CAN_SPLIT
Determines whether the resource leveling function can cause splits on remaining work on this task.
LEVELING_DELAY
public static final Key<Duration,Byte> LEVELING_DELAY
The time that a task is to be delayed from its early start date because of resource leveling.
LEVEL_ASSIGNMENTS
public static final Key<NullableBool,Byte> LEVEL_ASSIGNMENTS
Determines whether the leveling function can delay and split individual assignments in order to resolve over allocations.
MANUAL_DURATION
public static final Key<Duration,Byte> MANUAL_DURATION
Defines manually scheduled duration of a task.
MANUAL_FINISH
public static final Key<Date,Byte> MANUAL_FINISH
Defines manually scheduled finish of a task.
MANUAL_START
public static final Key<Date,Byte> MANUAL_START
Defines manually scheduled start of a task.
NAME
public static final Key<String,Byte> NAME
A task’s name.
NOTES_RTF
public static final Key<String,Byte> NOTES_RTF
The text notes in RTF format.
Supported for MPP formats only.
NOTES_TEXT
public static final Key<String,Byte> NOTES_TEXT
Notes’ plain text extracted from RTF data.
OUTLINE_LEVEL
public static final Key<Integer,Byte> OUTLINE_LEVEL
The outline level of a task.
OUTLINE_NUMBER
public static final Key<String,Byte> OUTLINE_NUMBER
The number that represents a task’s position in the hierarchical outline structure.
OVERTIME_COST
public static final Key<BigDecimal,Byte> OVERTIME_COST
The total overtime cost for a task, for a resource on all assigned tasks, or for a resource assignment.
OVERTIME_WORK
public static final Key<Duration,Byte> OVERTIME_WORK
The amount of overtime scheduled to be performed by all resources assigned to a task.
PERCENT_COMPLETE
public static final Key<Integer,Byte> PERCENT_COMPLETE
The current status of a task, expressed as the percentage of the task’s duration that has been completed.
PERCENT_WORK_COMPLETE
public static final Key<Integer,Byte> PERCENT_WORK_COMPLETE
The current status of a task expressed as the percentage of work that has been completed.
PHYSICAL_PERCENT_COMPLETE
public static final Key<Integer,Byte> PHYSICAL_PERCENT_COMPLETE
Percent complete value that can be be used as an alternative for calculating budgeted cost of work performed (BCWP).
PRELEVELED_FINISH
public static final Key<Date,Byte> PRELEVELED_FINISH
The finish date of a task as it was before resource leveling was done.
PRELEVELED_START
public static final Key<Date,Byte> PRELEVELED_START
The start date of a task as it was before resource leveling was done.
PRIORITY
public static final Key<Integer,Byte> PRIORITY
The level of importance given to a task, which in turn indicates how readily a task or assignment can be delayed or split during resource leveling.
REGULAR_WORK
public static final Key<Duration,Byte> REGULAR_WORK
The total amount of non overtime work scheduled to be performed by resources.
REMAINING_COST
public static final Key<BigDecimal,Byte> REMAINING_COST
The remaining scheduled expense that will be incurred in completing the remaining scheduled work.
REMAINING_DURATION
public static final Key<Duration,Byte> REMAINING_DURATION
The time that is required to complete the unfinished part of a task.
REMAINING_OVERTIME_COST
public static final Key<BigDecimal,Byte> REMAINING_OVERTIME_COST
The remaining scheduled overtime expense for a task.
REMAINING_OVERTIME_WORK
public static final Key<Duration,Byte> REMAINING_OVERTIME_WORK
The amount of remaining scheduled overtime time.
REMAINING_WORK
public static final Key<Duration,Byte> REMAINING_WORK
The time still required to complete a task or set of tasks.
RESUME
public static final Key<Date,Byte> RESUME
The date that the remaining part of a task is scheduled to resume after entering any progress.
START
public static final Key<Date,Byte> START
The scheduled start date of a task.
START_SLACK_TIME_SPAN
public static final Key<TimeDelta,Byte> START_SLACK_TIME_SPAN
The duration (in seconds) between the Early Start and Late Start dates.
START_TEXT
public static final Key<String,Byte> START_TEXT
Returns the task’s start text.
START_VARIANCE
public static final Key<Duration,Byte> START_VARIANCE
The time that represents the difference between a baseline start date of a task or assignment and its currently scheduled start date.
STATUS_MANAGER
public static final Key<String,Byte> STATUS_MANAGER
The name of the enterprise resource who is to receive status updates for the current task from resources.
STOP
public static final Key<Date,Byte> STOP
The date that represents the end of the actual portion of a task.
SUBPROJECT_NAME
public static final Key<String,Byte> SUBPROJECT_NAME
The source location of a subproject.
SV
public static final Key<Double,Byte> SV
The earned value schedule variance, through the project status date. Schedule variance (SV) is the difference between the BCWP and the BCWS.
TOTAL_SLACK_TIME_SPAN
public static final Key<TimeDelta,Byte> TOTAL_SLACK_TIME_SPAN
The time a task’s finish date can be delayed without delaying the project’s finish date.
TYPE
public static final Key<Integer,Byte> TYPE
The type of a task.
UID
public static final Key<Integer,Byte> UID
The unique Id of a task.
WARNING
public static final Key<Boolean,Byte> WARNING
Represents the flag which indicates that task has schedule discrepancies.
WBS
public static final Key<String,Byte> WBS
Work breakdown structure (WBS) codes.
WBS_LEVEL
public static final Key<String,Byte> WBS_LEVEL
The rightmost WBS level of a task.
WORK
public static final Key<Duration,Byte> WORK
The total time scheduled on a task for all assigned resources.
WORK_VARIANCE
public static final Key<Duration,Byte> WORK_VARIANCE
The difference between baseline work of a task and the currently scheduled work.